Project 1
Form & Function:
Expression of Truth/Beauty
Objective: The project
was to span a river with a bridge 190 feet. The bridge had to open 30 feet
wide by 40 feet high to clear river traffic. The bridge had to be worked
with the function that was pick out in order to open and close the bridge,