Architectural Design III

HOME

 

The objective of Architectural Design 3 has two main parts

 

The first is to understand and apply complex contextual issues in architecture design;

1)      Develop methods of data collection and analysis to aid in

programing and design process.

2)      Develop the ability to make a comprehensive analysis and

evaluation of a building.

3)      Develop an ability to give a rational explanation for design

ideas and practices.

4)      Develop the ability to apply constraints into the

development of the program and design of the project.

5)      Develop the ability to apply basic organization, spatial,

structural, and construction concepts and constraints for

the development of interior and exterior spaces, and

building elements.

 

The second is to compile portfolio material for the use in architecture design;

1)      Use drawing and model-making to convey architectural

concepts using professional conventions for presentation

for post-college employment

2)      Develop the ability to speak and write effectively concerning

architectural concepts through the examination of specific

building types.

3)      Learn to work with members of a design team through

progressive project contexts.

 

Project 1

A group project with the purpose of creating an innovation district program for a 10-acre site in

Levittown, NY. We were hired to plan an innovation district in Levittown, NY that will serve as

a catalyst for veterans, providing veteran support facilities, collaborative work space with an

exhibition/conference space, and residential live-work opportunities for veterans establishing

businesses. (Click link for Project 1)

 

Project 2

Project 2 was to design a response to the program developed in Project 1, groups were paired off

to exchange programs. The project called for the schematic design of the site, workplace, exhibit/

conference space, and the support facility. The buildings were to become an icon and focal point

for the Levittown veterans innovation district. This was to be done with collaboration from the

clients representative (a person from the other group) for specific information on the clients

preferences. A second addition to the project was to relocation the Veterans Memorial park from

assignment 2 onto the site. (Click link for Project 2)

 

Assignments 1-7

The purpose of the assignments was to help with the development of skills and knowledge that

could be used on the projects. (Click link for Assignments 1-7)

 

 

HOME