Statement
The
focus of this project was on how to make a function fit in an existing
prototype to make applied in present.
The
function was a 30 feet span opening that needs to be made in a bridge of 190 feet
span.
I
needed to change the bridge prototype based on the need of the mechanism of the
function that include some different motions and directions.