3x3CHART

 

 

GEARS

 

 

HYDRAULICS

 

 

BELT AND PULLEY

 

 

ARCH BRIDGE

 

 

 

Ø  HELP TO MOVE THE HALP OF THE OPENING TO DIFFERENT SIDE.

 

 

 

 

 

Ø  N/A

 

 

 

 

 

 

 

 

 

Ø  IT WOULD CREATE SUPPORT TO HOLD THE PART THAT IS BEING MOVE.

 

 

 

 

 

 

CABLE-STAYED BRIDGE

 

Ø  IT WOULD HELP TO CREATE THE OPENING AFTER THE PART IS LIFT.

Ø  EASIER THAN OTHER METHOR TO MEVE HAVE OBJECTS

Ø  WOULD GIVE THE PULLEY SOME MOVEMENT TO PULL THE BELTS UP

Ø  IT WOUL HELP TO HOLD THE GEARS, NADIT WOULD MOVE THE GEARS BACKWARD AFTERS THE OPENING STARTS TO MOVE INTO THE LAND

 

 

 

Ø  THE BELST WOULD GIVE SUPPORT TO THE PART THAT IS BEING LIFT.

Ø  PULLEY WOULD ROTATE AND COLLECTS THE BELTS, HELPING TO CREATE THE OPENING

 

 

 

 

 

CABLE-STAYED BRIDGE 2

 

 

Ø  WILL LIFT THE EAST PART OF THE BRIDGE BY PUTTING THIS PART OVER THE LAND.  NOT TAKING SPACE OF THE LAND OR THE RIVER

 

 

 

 

 

 

 

 

Ø  N/A

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Ø  GIIVING SUPPOT WHEN THE EAST PART OF THE BRIDGE IS BEING LIFT.

Ø  PROBLEM THE EACH BELT HAS TO WORK IN A DIFFERENT SPEED IN ORDER TO HELP TO LIFT THE EAST PART OF THE BRIDGE.