Chris Lacey
– Project 1
Statement:
The goal of this project is to design a bridge with a movable section. It must
span 190ft and have a 30ft by 40ft opening. The inspiration for this project
came from three common objects that move and can be found at home with three
different existing bridges used as prototypes.