Project 1 Bridge Phases Home
Form & Function:
Expression of Truth/Beauty
3X3 CHART |
|
|
|
|
Little adjustments
needed Could lift · Whole Bridge · Section Lift Roadbed to any desired
height depending on screw length |
Could open both or just
one side Truss would have to be
altered |
Equipment needed out of
bridge structure Could be flipped upside
down and placed on top of truss |
|
Cables could go under
roadbed Cables could retract
into the main cable |
Many adjustments need
to support bridge after it opens Bridge might not stay
up if road bed moves |
Cables would have to
detach from main cable upon opening road bed Road bed would have to
be put on tracks Cables pulled up to
make opening big enough for object to pass through |
|
Could be combined with
truss to support half of stationary bridge |
One side of the cables could easily retract into the main pillar |
Cables collapse and
bridge opens Could be combined with
other support to work |
Inspirations
C Clamp- Moving Join on
Bridge Self
Lifting Screw-Moves road bed vertical
Pulleys/Gears-help
the crew spin the larger screw