Architectural
Design II
Project 1
The
objective of this project is to design and develop a movable bridge from a
pre-existing bridge design, using concepts from household items.
Criteria:
190' bridge
span
No piles in
the water below
(Protect the
snails)
Allowing a
30'x40' block to pass through
Road 10'
above water
All members
of bridge no longer than 20'
3x3 Table
Bridge
Prototypes
The Usk River Crossing in Newport, the Trenton Through Bridge in
Utah, and the Tappan Zee Bridge in New York City
Inspiration
An
adjustable wrench (worm gear and track system, rotation to linear movement), a
telescoping magnet (sections that collapse into each other),
and a double hinged umbrella (multiple folding/rotating
points).
Design
Transformation
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Diagram
Animation