Final Design and Development
Philosophy:
I started with a uniform truss bridge and began to question how to
make my design work so that a 30 foot by 40 foot object may pass through
the span. I chose to make the roadbed lift using a hinge and pulleys.
This required I place a hinge at the pivot point of the road and make
the truss structure higher to place the pulleys in a location where they
could lift the roadbed. The second part of the transformation involves
retracting the lower truss rails using a motor and gears. This required
I make the truss rails thicker to accommodate the new distribution of
loads as well as the placement of the gears along a track attached to
the rails under the structure. Finally a observation deck and two story
living quarters were added to the bridge altering the design yet again.
To support the loads of the observation deck I extended the truss along
the top and placed four curved members in the corners.