Philosophy:

I started with a uniform truss bridge and began to question how to make my design work so that a 30 foot by 40 foot object may pass through the span. I chose to make the roadbed lift using a hinge and pulleys. This required I place a hinge at the pivot point of the road and make the truss structure higher to place the pulleys in a location where they could lift the roadbed. The second part of the transformation involves retracting the lower truss rails using a motor and gears. This required I make the truss rails thicker to accommodate the new distribution of loads as well as the placement of the gears along a track attached to the rails under the structure. Finally a observation deck and two story living quarters were added to the bridge altering the design yet again. To support the loads of the observation deck I extended the truss along the top and placed four curved members in the corners. 

Final Design:

3D Perspective Views

Plan View

Elevations

                                  

Animations

 

 

* Home * Architectural Design I * Architectural Design II * Construction Design *

* Site Planning * Personal Portfolio * Resume * Contact Information *

The views and opinions expressed on this page are strictly those of the page author. The contents of this page have not been reviewed or approved by Farmingdale State.

Last updated: 05/14/10